How to Choose an ADU Builder in Utah

Choose an ADU builder in Utah the same way you'd choose any contractor, with an active license, current insurance and a written scope, and then ask the questions that only an ADU raises. Can your lot have one at all? Who confirms the utilities can serve it? Who draws the plans, pulls the permit and handles the city's ADU rules? A builder who has done ADUs will answer those before you ask. This guide covers what to check, what to ask and what to watch for.
Start with what kind of ADU you want
Utah law treats two kinds of accessory dwelling unit very differently, and the right builder depends on which one you're planning.
- An internal ADU is built inside your home, within its existing footprint. A basement apartment is the usual example. It's mostly interior work: egress, a kitchen, a bathroom, a private entrance and fire and alarm requirements. A builder who finishes basements well is a strong fit. See mother-in-law suites in Utah.
- A detached ADU is a separate building on your lot. It's a small house: foundation, framing, roof, exterior, utilities brought out to it, and everything inside. You want a builder who builds whole structures, not only interiors.
For the rules on each, see our guide to ADU zoning and permits in Utah.
1. Check the basics first
These apply to any contractor, and an ADU is no exception:
- An active Utah license in a classification that fits the work. You can check it with the Division of Professional Licensing's free Verify a License search.
- Current general liability insurance. Ask for the certificate, and ask how the crew and subcontractors are covered for workers' compensation.
- A written contract. It's also what protects you from liens if a subcontractor or supplier isn't paid.
Our guide on how to choose a basement contractor walks through each of these in detail, including how Utah's lien protection works.
2. Ask whether your lot can have one
A good ADU builder starts with eligibility, not floor plans. Before anyone designs, someone needs to confirm:
- Zoning. An internal ADU is a permitted use in areas zoned primarily residential. For a detached ADU, state law requires most Wasatch Front cities to allow one on lots of 11,000 square feet or more with a single-family home, and cities may allow them on smaller lots.
- Easements and setbacks. A city can bar a detached unit in a utility or recorded easement or in the front yard, and its setbacks decide where the unit can sit.
- HOA and development agreements. Some subdivisions can still prohibit detached ADUs. If you're in one, the HOA may also need to approve the design. See how HOA review works in Traverse Mountain for one example.
- Owner occupancy and rentals. Cities can require you to live in the house or the ADU, and can set minimum rental terms and require a rental license.
Ask the builder: who checks eligibility, and what happens if the city says no after we've started on plans?
3. Ask about utilities early
For a detached unit, utilities are often the biggest unknown. Sewer, culinary water, electrical and storm water all have to reach the unit, and a city can prohibit a detached ADU that can't get adequate service or whose connection point lacks capacity. Your electrical panel may also need an upgrade to serve a second home.
Ask the builder: how will you confirm capacity and connection points, what's assumed in the bid for distance and trenching, and what happens if the connection turns out to be harder than expected?
4. Ask who handles plans and the permit
An ADU needs more paperwork than most projects. Depending on the city, the permit application can ask for complete construction plans, a site plan with setbacks, a gas line diagram, energy documents and heating and cooling load calculations. Plans examiners can also ask for engineered, stamped plans.
Ask the builder: do you draw the plans or work with a designer, who stamps them if the city requires it, who submits the permit, and who schedules the inspections? The answer should be in the contract.
5. Ask how they handle the code for a second home
An ADU is a dwelling, so it brings requirements a bonus room doesn't:
- Egress for every bedroom, especially in a basement unit
- Smoke and carbon monoxide alarms, which Utah's code amendments require when an ADU is created
- Fire-resistance rules for walls close to a property line on a detached unit
- Parking. A city can require up to two on-site spaces for a detached ADU of 650 square feet or more, or one for a smaller unit, and replacement parking if you convert a detached garage
Ask the builder: which of these apply to my plan, and how are they handled in the design?
6. Compare bids on the same items
ADU bids vary more than most, because so much depends on the site. Line them up on:
- Site work and utilities, listed separately from the building, with the connection points and distances assumed
- Plans, engineering and permit fees, and who pays each
- Foundation and structure for a detached unit
- The kitchen and bathroom, including allowances for cabinets, counters and fixtures
- Heating and cooling sized for the unit
- Landscaping, fencing, a path and yard repair after construction
- Exclusions, including any work on the main house
Our ADU cost guide explains what moves each of these and what a good bid looks like. A big gap between two bids usually means one leaves something out.
7. Ask about their ADU experience
- How many ADUs have you built, internal or detached?
- Can I see one, or talk to the owner?
- Have you built one in my city, and what did the city ask for?
- What surprised you on your last ADU, and how did you handle it?
- How do you handle changes after we've signed?
- What does your warranty cover, and for how long?
Red flags
- Plans drawn before anyone checks whether the lot qualifies
- A lump-sum bid with site work and utilities folded in or missing
- Vague answers about who handles the permit and the city's ADU rules
- Advice to skip the permit or call the unit something else
- No license number, no insurance certificate or no written contract
- A large payment before any work has started
How PANDEN works
PANDEN is a Lehi-based builder that builds detached ADUs for rentals and mother-in-law suites, and finishes basements, including basement apartments, across Utah County and Salt Lake County. Every project starts with a conversation about what you want and a look at your lot, followed by an itemized bid. We prepare the plans, submit the permit and schedule every inspection. See our ADU page.
Frequently asked questions
Does an ADU builder need a license in Utah?
Yes. Building an ADU is a permitted construction project, so check that the builder's license is active and its classification fits the work through the Division of Professional Licensing's Verify a License search.
Should I hire a basement contractor or a home builder for an ADU?
It depends on the kind. A basement apartment is interior work, so a strong basement finisher fits. A detached ADU is a small house, so you want a builder who builds whole structures.
Can any lot have an ADU?
No. Zoning, lot size, easements, HOA rules and utility capacity all decide whether a unit is allowed and where. A good builder checks these before designing.
Who gets the permit for an ADU?
It should be written in the contract. PANDEN prepares the plans and submits the permit for its projects.
How do I compare ADU bids?
Line them up on site work and utilities, plans and permits, allowances and exclusions. See our ADU cost guide.
Can I rent out my ADU?
Often yes, within your city's rules on owner occupancy, rental terms and licensing. See ADU zoning and permits in Utah.
Planning an ADU? Contact us for a free estimate and we'll look at your lot, check what your city allows and walk you through what it would take.
Sources: Utah Code 10-21-303 (internal accessory dwelling units) and 10-21-304 (detached accessory dwelling units, effective October 1, 2026); Utah Code 15A-3-202 (Utah amendments to the International Residential Code); 2021 International Residential Code R302.1; Utah Division of Professional Licensing, license verification and insurance requirements; City of Herriman detached ADU page.
